Projects
Through the Environmental Investment Center (EIC) Utilitas Energy Group has received grants for the implementation of several projects from the Green Investment Scheme Fund and the Cohesion Fund of the European Union.
Project name | Project period | Beneficiary | Project total cost | Amount of the grant |
---|---|---|---|---|
Tallinn green hydrogen complete chain | 2021 | OÜ Utilitas | 6 111 920 € | 4 999 360 € |
Liquidation of the local boiler house at Siidisaba 6 and the boiler station at Vindi 16A, reconstruction of the district heating network and connection to the main network | 2021 | AS Utilitas Tallinn | 1 490 150 € | 405 600 € |
Liquidation of the boiler station at Lasnamäe 30B, reconstruction of the district heating network, and connection to the main network | 2020 | AS Utilitas Tallinn | 1 412 565 € | 461 120 € |
Reconstruction of the trunk pipeline in Valga | 2020 | AS Utilitas Eesti | 713 972 € | 208 740 € |
Reconstruction of the Rapla pipeline branch from chamber K50 to chamber K52 | 2020 | AS Utilitas Eesti | 81 763 € | 31 760 € |
Reconstruction of the trunk pipeline in Kärdla and connecting Hiiumaa Hospital | 2020 | AS Utilitas Eesti | 249 900 € | 96 200 € |
Reconstruction of the Keila trunk pipeline on Pae street | 2020 | AS Utilitas Eesti | 459 900 € | 120 040 € |
Reconstruction of the trunk pipeline in Haapsalu from Lossiplats to Wiedemanni 12 and Suur-Mere 17 | 2020 | AS Utilitas Eesti | 628 904 € | 173 250 € |
Reconstruction of the district heating network of local boiler house at Peterburi tee 32 and connecting to the main network | 2019–2020 | AS Utilitas Tallinn | 1 836 448 € | 352 790 € |
Reconstruction of the branch pipelines of Sauna street in Rapla | 2019 | AS Utilitas Eesti | 55 825 € | 27 915,50 € |
Reconstruction of the branch pipelines in Jõgeva | 2019 | AS Utilitas Eesti | 269 912 € | 129 111 € |
Reconstruction of the trunk pipeline in Haapsalu on Sireli street and Lihula road | 2019 | AS Utilitas Eesti | 499 942 € | 153 150 € |
Reconstruction of the trunk pipeline in Rapla | 2018-2019 | AS Utilitas Eesti | 448 150 € | 119 800 € |
Closure of the Nisu 18a boiler house and the Kaera 19a boiler station | 2018-2020 | AS Utilitas Tallinn | 978 305 € | 489 153 € |
Reconstruction of the trunk pipeline in Keila | 2018-2019 | AS Utilitas Eesti | 447 068 € | 124 770 € |
Development of the district heating network in Maardu | 2018-2020 | AS Utilitas Tallinn | 1 542 485 € | 771 243 € |
Reconstruction of the main trunk pipeline in Valga | 2017-2018 | AS Utilitas Eesti | 1 323 050 € | 369 200 € |
Design and construction of flue gas condenser of the boiler house at Spordi 9 | 2017-2018 | AS Utilitas Tallinn | 280 000 € | 140 000 € |
Design and construction of the Kristiine boiler house flue gas condenser | 2017-2019 | AS Utilitas Tallinn | 3 500 000 € | 1 500 000 € |
JDesign and construction of the flue gas condenser for the Jõgeva boiler house wood chip boiler | 2017-2018 | AS Utilitas Eesti | 760 000 € | 380 000 € |
Reconstruction of the main trunk pipeline in Haapsalu | 2017-2018 | AS Utilitas Eesti | 627 011 € | 162 790 € |
Design and construction of the flue gas condenser for the Haapsalu boiler house wood chip boiler | 2016-2017 | AS Utilitas Eesti | 824 250 € | 412 125 € |
Switching the Rapla central boiler house to renewable fuel | 2013 | AS Utilitas Eesti | 883 308 € | 883 308 € |
The development of a district heating network in the Kopli area in Tallinn | 2012 | AS Utilitas Tallinn | 554 429 € | 554 429 € |